Writing a PRD and handing it to engineering
Writing a PRD and handing it to engineering
Draft requirements from the evidence, get them approved, break them into stories and send them to your tracker.
Product Management Intelligence add-on, $99 per PM seat a month; part of the 7-day free trial Open in TR-AI5 min
- 1DraftOpen the opportunity → Draft a PRD with AI (or From the records only).
- 2Fill the gapsRead Missing information, write the sections marked “needs input” (UX, security and privacy, out of scope) and check every cited line.
- 3ApproveSend for approval to someone with “Approve product decisions”.
- 4StoriesDraft with AI or add by hand; check the acceptance criteria and mark items ready.
- 5SendSend ready items to engineering. The engineering owner accepts or returns the hand-off; Sync status shows progress.
Tips & tricks
- Editing an approved PRD creates the next version; stories stay linked to every version.
- Sending twice never creates duplicate tickets.