# The Disk That Fills on a Saturday

> Threshold alerts tell you a disk is at 90%. They don’t tell you it will hit 100% on Saturday at 02:00, when the nightly backup adds its 2%. Capacity forecasting in TicketResolve tells you when a resource runs out, how sure it is, and how accurate it turned out to be, from your own telemetry, with no forecast at all when the data is too thin.

Source: https://www.ticketresolve.ai/blog/the-disk-that-fills-on-a-saturday · Published 2026-11-16 · TicketResolve AI

It's 02:07 on a Saturday. The on-call engineer at an e-commerce company is woken by a page: the database disk is full, and the shop has stopped taking orders.

Here's what had happened that week:

- **Monday:** the disk was at 84%. The alert threshold was 90%, so nothing fired.
- **Thursday:** 88%. Still nothing.
- **Friday 18:00:** 89%. Everyone went home.
- **Saturday 02:00:** the nightly backup wrote its usual 2% of temporary files. The disk went from 89% to 91%, the alert fired, and in the same minute the remaining space ran out because a log rotation job also ran at 02:00.

Every number was in the monitoring. Nobody asked the question that mattered: *when* will it fill, and how sure are we?

Threshold alerts tell you a disk is at 90%. They don't tell you it will hit 100% on Saturday at 02:00, when the nightly backup adds its 2%. By the time the alert fires, the useful question has already gone unasked.

## First, the basics

- **Capacity** is how much of a resource you have: disk, memory, CPU, database connections, queue depth, request volume.
- **Utilisation** is how much is in use. **A limit** is where it runs out. **A warning level** is a point before that.
- **A threshold alert** fires when utilisation crosses a fixed level.
- **A forecast** predicts future values. **A trend** is the general direction; **a pattern** (seasonality) repeats by hour of the day or week.
- **A 95% interval** is the range the forecast expects values to fall in, 95% of the time.
- **A backtest** checks a model by refitting it without recent data and comparing its prediction with what actually happened.
- **Telemetry** is the metrics your systems already send.
- **Inferred** means predicted, not observed.

**Why does this matter?** Running out of capacity is one of the most predictable outages there is. A forecast that says *when*, with honest uncertainty, gives you days to act instead of a page at 2 a.m.

## The problem, in plain terms

1. **Threshold alerts say "now"**, not "when".
2. **Straight-line estimates miss patterns** like nightly backups.
3. **Forecasts don't say how sure they are.**
4. **Nobody checks** whether past forecasts were right.
5. **Thin data gets a confident line anyway.**

## From "now" to "when"

**Infrastructure forecasting reads the capacity metrics already flowing in from your telemetry.** That means **CPU, memory, disk, database connections and size, queue depth and request volume**. It builds **hourly points: the peak for utilisation, the total for requests**. Then it **fits a trend together with the pattern the data actually has, by hour of the week or hour of the day**.

That pattern matters. **A straight line through a database that jumps every night during backups gets the date wrong. A forecast that keeps the nightly jump gets it right**, and that's how a disk at 78% can reach 80% *tonight*.

For each resource you get **three dates for the warning level and the limit**:

- the **expected** date;
- the **earliest**, when the upper edge of the 95% interval gets there;
- the **latest**, when the lower edge does.

## Saying how sure it is

A date without a measure of how sure it is just invites false certainty. **Every forecast comes with a confidence (high, medium or low) and the reasons for it**:

- how many days of history there are;
- the **backtest**: **refit without the last seven days and compare with what happened**;
- how often values fell inside the interval;
- gaps in the data.

**A week later, the forecast made back then is compared with what actually happened. That measured accuracy sits on the page next to the new forecast**, so you can see whether the model has earned your trust for this service.

**With less than seven days of data, or data with too many holes, there's no forecast at all. The page says why** instead of drawing a confident line through nothing.

## Limits are yours

**CPU and disk have natural limits. Memory, connection pools, database volumes and queues don't, unless you tell us**: the container's memory limit, `max_connections`, the volume size. **Without a limit you still see the trend, but not a date. We don't guess a ceiling for you.**

## When it matters

**Forecasts refresh every six hours.** **If a resource is expected to reach its limit within a week, the service owner gets a critical finding. Within two weeks, a high one. The warning level within 30 days raises a medium one.** **A low-confidence forecast is never escalated beyond medium.** **Every forecast finding is labelled as inferred**, because it's a prediction, not something that has happened yet.

**When the trend changes**, perhaps because someone cleaned up the logs, **the finding resolves itself**.

## A worked example, start to finish

Here's the same e-commerce company, a month later, with infrastructure forecasting. The company and figures are illustrative.

**Setup.** Their telemetry already sends disk, memory, connections and request volume. The SRE lead, Joaquín, opens **Reliability Intelligence → Forecasting**. Disk has a natural limit; for the database he sets `max_connections` (400) and for the order queue a depth limit (50,000). Memory on the API containers gets the container's memory limit.

**Monday 06:00, first forecast for orders-db disk.** At 79% now. The forecast keeps the **nightly pattern**: a 2% jump at 02:00 for backups.

- **Warning level (85%)**: expected **Thursday 02:00**, earliest Wednesday 02:00, latest Saturday 02:00.
- **Limit (100%)**: expected **in 12 days**, earliest in 9, latest in 16.
- **Confidence: high.** 60 days of history, backtest error small, 94% of values fell inside the interval, no gaps.

**Monday 06:00, finding.** The limit within two weeks raises a **high** finding for orders-db's owner, **labelled inferred**.

**Monday, orders-db connections.** Peak 310 of 400. **Limit expected in 23 days.** **Confidence: medium**, because the backtest missed a promotion spike. Within 30 days of the warning level: a **medium** finding.

**Monday, new search service.** Only **5 days of data**. **No forecast**; the page says why.

**Monday, the queue.** No limit was set for the image-processing queue before; it showed **a trend but no date**. Joaquín adds 50,000; it now has dates.

**Tuesday.** The owner cleans up old logs and moves temporary backup files to another volume. Disk drops to 64%.

**Tuesday 12:00, next refresh.** The trend has changed: the limit is now months away. **The finding resolves itself.**

**A week later, measured accuracy.** Next to the new forecast: last Monday's forecast for **Friday's peak** was 83%; actual was 82.6%, inside the interval. For connections, the forecast for Friday underestimated by 6%, outside the interval, during a promotion. Joaquín now trusts the disk forecast more than the connection one, for good reason.

**Saturday 02:00.** Nobody is paged.

## Five more real-world scenarios

### 1. No limit set

**Situation.** A connection pool has no limit configured.

**How TR handles it.** You see the trend, but no date. A ceiling isn't guessed.

### 2. Gaps in data

**Situation.** A metrics agent was down for three days last week.

**How TR handles it.** Gaps lower the confidence. With too many holes, there's no forecast, and the page says why.

### 3. Low confidence, close to the limit

**Situation.** A low-confidence forecast says a queue will hit its limit in 4 days.

**How TR handles it.** A low-confidence forecast is never escalated beyond medium.

### 4. Daily vs weekly patterns

**Situation.** Request volume spikes every Monday morning.

**How TR handles it.** The forecast fits the pattern the data has, by hour of the week or hour of the day.

### 5. A forecast in a report

**Situation.** Someone wants to count forecasts that "prevented" outages.

**How TR handles it.** Forecast findings are labelled inferred. A forecast that fired isn't an incident that didn't happen.

## Reading a forecast before you act

A forecast is a prompt to look, not an order. Before you buy disk or raise a limit, read it in this order:

1. **Is the limit right?** Check the limit the forecast is counting towards. A memory forecast against the wrong container limit gives the wrong date with high confidence.
2. **How wide is the gap between earliest and latest?** A narrow gap means the pattern is steady. A wide one means the date could move by days, so act on the earliest date for anything critical.
3. **What does the confidence say, and why?** Few days of history, a poor backtest or gaps each lower it. The reasons tell you whether more data will help.
4. **How accurate was last week's forecast?** If measured accuracy is poor for this resource, treat the date as rough and look at the trend.
5. **Is the growth expected?** A launch or a migration can explain a steep trend. If it's expected and temporary, you may only need to watch it.

Then decide: clean up, add capacity, raise the limit or accept it. When the trend changes, the finding resolves itself, so there's no ticket to close by hand.

## Before and after

**Before.** A disk at 89% on Friday evening, an alert at 90%, a backup at 02:00, and a page when the shop had already stopped.

**After.** A forecast that keeps the nightly jump, three dates with an interval, confidence with reasons, a high finding twelve days ahead, measured accuracy next to the new forecast, and a finding that resolved itself once the logs were cleaned.

## How to tell it's working

- **Capacity findings arrive days ahead**, not at the threshold.
- **Measured accuracy** is good for the resources you rely on.
- **Every resource that matters has a limit set.**
- **Fewer 2 a.m. capacity pages.**

## Who it's for

- **SREs and platform teams.**
- **Service owners** who receive capacity findings.
- **Engineering leaders** planning infrastructure.

## How it fits with the rest of TicketResolve

Forecasting is part of **Reliability Intelligence**. Each forecast names the services that call the resource, findings go to service owners, and **forecasting accuracy and warning lead time** appear in **reliability metrics**. Forecasts show on the **service timeline**.

## Mistakes to avoid

- **Leaving limits unset** for memory, pools, volumes and queues.
- **Trusting a forecast with poor measured accuracy.**
- **Treating forecast findings as incidents.** They're inferred.

## Do it in TicketResolve, step by step

**Where:** Reliability Intelligence → Forecasting (`/dashboard/reliability/forecasting`). **You'll need:** Reliability intelligence; capacity metrics from your telemetry. **Full guide:** [Infrastructure forecasting](https://www.ticketresolve.ai/docs/analytics/infrastructure-forecasting).

1. **Check your telemetry.** CPU, memory, disk, database connections and size, queue depth and request volume.
2. **Set the limits only you know**: container memory limits, `max_connections`, volume sizes, queue limits.
3. **Open Forecasting.** Each resource shows expected, earliest and latest dates for the warning level and the limit.
4. **Read the confidence and its reasons**: history, backtest, interval coverage, gaps.
5. **Check measured accuracy** next to each forecast.
6. **Act on findings**: critical within a week, high within two weeks, medium for the warning level within 30 days.
7. **Watch findings resolve** when the trend changes.

**How to check it worked:** a resource shows three dates, a confidence with reasons, and measured accuracy from the week before.

Read the [infrastructure forecasting guide](https://www.ticketresolve.ai/docs/analytics/infrastructure-forecasting), then set the limits that only your team knows.

## Frequently asked questions

**Which resources are forecast?**
CPU, memory, disk, database connections and size, queue depth and request volume.

**Does it handle nightly backups?**
Yes. It fits the pattern the data has, by hour of the week or hour of the day.

**What are the three dates?**
Expected, earliest (upper edge of the 95% interval) and latest (lower edge).

**How is confidence decided?**
From days of history, a backtest, interval coverage and gaps.

**What if there's too little data?**
With less than seven days, or too many holes, there's no forecast, and the page says why.

**Does it guess limits?**
No. Without a limit you see the trend, not a date.

**How often do forecasts refresh?**
Every six hours.

**Can a low-confidence forecast page someone?**
It's never escalated beyond medium.

**Which date should I act on?**
For critical resources, the earliest date, when the upper edge of the 95% interval reaches the limit.